Pachaug Pond Dam
April 1, 2022Griswold, CT – Engineering design services for the emergency, temporary and final design for repairs to the existing dam and…
Kensington Dam
February 21, 2020Berlin, CT – Kensington Dam impounds the Mattabesset River to form the 12 acre Railroad Pond. The dam is 210…
Rainbow Dam Fish Lift – Farmington River
September 6, 2017Windsor Locks, CT – Macchi Engineers completed a feasibility study in 2007 for the reconstruction of the Rainbow Dam Fishway and to improve…
Lake Forest Dam and Eel Passage
September 6, 2017The project consisted of a complete engineering study to document the current condition of the dam and determine the repairs…
Savin Lake Dam
February 24, 2017Lebanon, CT – The Savin Lake Dam is approximately 800 feet in length and 20 feet in height. It consists…
Higganum Reservoir Dam
January 1, 2017Haddam, CT – The project included modifications and additions to the existing spillway to maintain the current outflows without overtopping…